Skip to content
AyoKoding

Artifact: DORA Diagnostic Memo — Platform Team Quarterly Numbers

A DORA-metrics-based diagnostic memo naming where to invest next -- exercises co-11. Everline and every name here are fictional; every number is an illustrative, constructed example.

This quarter's numbers: deployment frequency -- 3 deploys/week (healthy for this team's size); change-failure rate -- 8% (healthy, below the team's own 10% target); failed-deployment recovery time -- 40 minutes (healthy); lead time for changes -- 6 days from first commit to production (the outlier -- every other metric is solid).

Diagnosis: the team isn't shipping recklessly (change-failure rate is fine) and isn't slow to recover when something does break (recovery time is fine) -- the bottleneck is specifically how long a change sits before it ships at all. Looking at where the 6 days actually goes: roughly 4 of them are PR review turnaround, not implementation time.

Recommendation: invest in review turnaround specifically -- a same-day review SLA and designating two rotating "review-first" engineers per week -- not a generic "let's move faster" push on implementation speed, which isn't where the time is actually going.

Last updated July 17, 2026

Command Palette

Search for a command to run...